Showing posts with label Pontoon Bridge. Show all posts
Showing posts with label Pontoon Bridge. Show all posts

Monday, January 28, 2019

Crossing a Pontoon Bridge at Night

Crossing a pontoon bridge at night, under the supervision of the Pioniere during an exercise (note the coloured bands on helmets and caps). Brückengerät B bridge construction was a rather complicated procedure that required a reconnaissance of the area to determine the most suitable site to build the bridge and determine the type of bridge required. The Brückengerät B pontoon bridge sections could be assembled in three different configurations: a 130m-long version with a maximum capacity of 4 tons, an 80m-long version with a capacity of 8 tons, and a 50m-long version that could carry up to 20 tons.


Source :
Book "German Pionier 1939-45: Combat Engineer of the Wehrmacht" by Gordon L. Rottman

Monday, October 10, 2016

Gebirgs Pioneer Erecting a Bridge

A Gebirgsjäger pioneer unit are seen erecting a bridge equipment "C" across a river in Poland, 1939. Much of the wood obtained to construct these bridges were commandeered from lumber stocks and followed the advancing column into Poland.


Source :
Book "Hitler's Mountain Troops 1939-1945" by Ian Baxter