Showing posts with label Engineer and Engineering. Show all posts
Showing posts with label Engineer and Engineering. Show all posts

Monday, October 10, 2016

Gebirgs Engineer Fixing a Telephone Line

Poland 1939: One of the most important aspects of military synchronization was effective communication. Here, in this photograph, a Gebirgsjäger signalman engineer is seen fixing a telephone line so that the various commands could communicate between themselves.


Source :
Book "Hitler's Mountain Troops 1939-1945" by Ian Baxter

Gebirgs Pioneer Erecting a Bridge

A Gebirgsjäger pioneer unit are seen erecting a bridge equipment "C" across a river in Poland, 1939. Much of the wood obtained to construct these bridges were commandeered from lumber stocks and followed the advancing column into Poland.


Source :
Book "Hitler's Mountain Troops 1939-1945" by Ian Baxter

Gebirgs Engineers at Work

Gebirgsjäger engineers have set to work preparing ground, probably for a bridging section across a river in Poland, 1939. Many of the bridges in southern Poland were destroyed by Polish demolition teams which often hindered German movement.


Source :
Book "Hitler's Mountain Troops 1939-1945" by Ian Baxter

Friday, October 16, 2015

A Type II Coastal U-Boat

Although this shows the small conning tower of a Type II coastal boat, it does drive home the lookouts' vulnerability, especially during hard weather when water constantly washed over the top of the tower. Larger boats had more space, but the towers weren't very much higher. The lapel-less collar of the person leaning on the hatch cover indicates that he is an engineer. The pressure-resistant hatch leading into the U-boat was almost a meter below his feet, and this raised grating merely prevented men falling down the opening in the upper deck. At sea, only the conning tower hatch would have been used, but in port it was more convenient to use the lower entrances. Trees in the background and the presence of a civilian suggests that this is close to harbour.