Monday, January 28, 2019

Crossing a Pontoon Bridge at Night

Crossing a pontoon bridge at night, under the supervision of the Pioniere during an exercise (note the coloured bands on helmets and caps). Brückengerät B bridge construction was a rather complicated procedure that required a reconnaissance of the area to determine the most suitable site to build the bridge and determine the type of bridge required. The Brückengerät B pontoon bridge sections could be assembled in three different configurations: a 130m-long version with a maximum capacity of 4 tons, an 80m-long version with a capacity of 8 tons, and a 50m-long version that could carry up to 20 tons.


Source :
Book "German Pionier 1939-45: Combat Engineer of the Wehrmacht" by Gordon L. Rottman

No comments:

Post a Comment